[1]李宏江,张劲泉,李万恒,等.PC斜拉桥辅助墩拉力摆断裂后的状态模拟[J].深圳大学学报理工版,2010,27(3):280-285.
 LI Hong-jiang,ZHANG Jin-quan,LI Wan-heng,et al.Simulation on the state after fracture of tension rocker bearing cables at auxiliary piers in a PC cable-stayed bridge[J].Journal of Shenzhen University Science and Engineering,2010,27(3):280-285.
点击复制

PC斜拉桥辅助墩拉力摆断裂后的状态模拟()
分享到:

《深圳大学学报理工版》[ISSN:1000-2618/CN:44-1401/N]

卷:
第27卷
期数:
2010年3期
页码:
280-285
栏目:
土木建筑工程
出版日期:
2010-07-30

文章信息/Info

Title:
Simulation on the state after fracture of tension rocker bearing cables at auxiliary piers in a PC cable-stayed bridge
文章编号:
1000-2618(2010)03-0280-06
作者:
李宏江张劲泉李万恒蒋含莞
交通运输部公路科学研究院,北京 100088
Author(s):
LI Hong-jiangZHANG Jin-quanLI Wan-hengand JIANG Han-wan
Research Institute of Highway
the Ministry of Communications
Beijing 100088
P.R.China
关键词:
桥梁工程预应力混凝土斜拉桥反演分析永和大桥
Keywords:
bridge engineeringprestressed concretecable stayed bridgeinversion analysisYonghe Bridge
分类号:
U 445.7
文献标志码:
A
摘要:
以天津永和大桥拉力摆断裂为例,介绍辅助墩拉力摆的断裂情况及其成因.为实现拉力摆断裂后的结构状态模拟,分析了拉力摆断裂引起的结构状态指标(桥面线形、塔顶偏位、索力及辅助墩支座脱空等)的变化,给出拉力摆断裂后结构状态模拟的目标和误差控制准则.在分析斜拉索索力与结构变位指标相关性的基础上,研究了拉力摆断裂后结构状态模拟的实现途径及步骤,形成一种基于现状检测结果和索力调整的PC斜拉桥结构状态反演分析技术.模拟计算结果表明,该分析技术能较全面反映检测结果,与结构实际受力状态吻合,有工程应用价值.
Abstract:
The fracture and the causes of its tension rocker bearing cables installed at auxiliary piers of the Yonghe Bridge in Tianjin were addressed.The structural state indexes such as the deck alignment,displacements at top of pylons,stayed cable forces and disengaging distance between compression bearings and its main girder were analyzed.The objectives and error control criteria for structural state simulation were presented.Moreover,the correlations of cable stayed forces and structural deformation indexes are analyzed,and the method of structural state simulation was studied.Finally,an inversion analysis method based on adjusting cable stayed forces was established.Calculation results show that this method can fully reflect detection results and actual structural state changes,and it can be useful to other projects.

参考文献/References:



[1]王伯惠.斜拉桥结构发展和中国经验[M].北京:人民交通出版社,2003.
[2]周海俊,米红雨,谭也平.锈蚀-疲劳作用下的砼梁桥失效概率分析[J].深圳大学学报理工版,2010,27(1):109-113.
[3]李宏江,李万恒,张劲泉,等.天津永和大桥的维修与加固[J].世界桥梁,2009,37(1):53-56.
[4]李宏江,李万恒,张劲泉,等.天津永和大桥合龙段拆除后的主梁线形调整[J].公路交通科技,2009,26(6):98-103.
[5]李宏江,王江,张永明,等.天津永和斜拉桥换索后的索力调整[J].公路交通科技,2008,25(10):79-83.
[6]李宏江.用于结构状态判别的PC斜拉桥温度效应[J].土木建筑与环境工程,2009(5):81-85.
[7]中华人民共和国行业推荐性标准.JTG/T D65-01-2007公路斜拉桥设计细则[S].北京:人民交通出版社,2007.
[8]高荣雄,李孟然,彭少民.斜拉桥成桥索力优化研究[J].武汉理工大学学报,2007,29(S2):133-136.
[9]黄民水,朱宏平.基于灵敏度分析与优化设计原理的桥梁结构有限元模型修正[J].武汉大学自然科学学报,2008,13(1):87-92.


[1]Wang Bo-hui.The development of cable stayed bridges and experience in China[M].Beijing:China Communications Press,2003.(in Chinese)
[2]ZHOU Hai-jun,MI Hong-yu,and TAN Ye-ping.Failure probability analysis of reinforced concrete bridges under coupled corrosion fatigue effects[J].Journal of Shenzhen University Science and Engineering,2010,27(1):109-113.(in Chinese)
[3]LI Hong-jiang,LI Wan-heng,ZHANG Jin-quan,et al.Rehabilitation and strengthening of Yonghe Bridge in Tianjin[J].World Bridges,2009,37(1):53-56.(in Chinese)
[4]LI Hong-jiang,LI Wan-heng,ZHANG Jin-quan,et al.Adjustment of alignment of main girder after removal of closure segment in Tianjin Yonghe Bridge[J].Journal of Highway and Transportation Research and Development,2009,26(6):98-103.(in Chinese)
[5]LI Hong-jiang,WANG Jiang,ZHANG Yong-ming,et al.Cable force adjustment after cable replacement for Tianjin Yonghe Cable-stayed Bridge[J].Journal of Highway and Transportation Research and Development,2008,25(10):79-83.(in Chinese)
[6]LI Hong-jiang.Temperature effect analysis for structural state estimation of PC cable-stayed bridges[J].Journal of Civil,Architectural and Environmental Engineering,2009(5):81-85.(in Chinese)
[7]Professional and Propositional Standard of the People’s Republic of China JTG/T D65-01-2007,Guidelines for Design of Highway Cable-stayed Bridge[S].Beijing:China Communications Press,2007.
[8]GAO Rong-xiong,LI Meng-ran,PENG Shao-min.Optimizing Research on Cable Tension of Cablestayed Bridge,Journal of Wuhan University of Technology,2007,29(S2):133-136.(in Chinese)
[9]HUANG Minshui,ZHU Hongping.Finite element model updating of bridge structures based on sensitivity analysis and optimization algorithm[J].Wuhan University Journal of Natural Sciences,2008,13(1):87-92.(in Chinese)

相似文献/References:

[1]韩振峰,叶爱君.桥梁群桩基础抗震能力值灵敏性分析[J].深圳大学学报理工版,2010,27(4):452.
 HAN Zhen-feng and YE Ai-jun.Sensitivity analysis on antiseismic capacity of bridge pile foundation[J].Journal of Shenzhen University Science and Engineering,2010,27(3):452.
[2]罗帅,刘红军,王刚.考虑桥面运动的斜拉索减振模型[J].深圳大学学报理工版,2010,27(4):470.
 LUO Shuai,LIU Hong-jun,and WANG Gang.The characteristic of stay-cable damping system in consideration of bridge deck vibration[J].Journal of Shenzhen University Science and Engineering,2010,27(3):470.
[3]俞博,叶见曙,张剑,等.装配式混凝土铰接板桥铰缝剪力计算[J].深圳大学学报理工版,2011,28(No.1(001-095)):60.
 YU Bo,YE Jian-shu,ZHANG Jian,et al.Transverse shear of fabricated concrete articulated plate bridge[J].Journal of Shenzhen University Science and Engineering,2011,28(3):60.
[4]杨仕若,曾庆元.铁路车桥耦合振动模态法分析[J].深圳大学学报理工版,2011,28(No.2(095-188)):131.
 YANG Shi-ruo and ZENG Qing-yuan.Coupling vibration analysis of vehicle-bridge by mode method[J].Journal of Shenzhen University Science and Engineering,2011,28(3):131.
[5]贾布裕,颜全胜,余晓琳.考虑滑移和剪力滞的组合梁斜拉桥徐变分析[J].深圳大学学报理工版,2011,28(No.2(095-188)):136.
 JIA Bu-yu,YAN Quan-sheng,and YU Xiao-lin.Analysis of creep of composite cable stayed bridge considering the slip and shear lag effect[J].Journal of Shenzhen University Science and Engineering,2011,28(3):136.
[6]杨仕若,曾庆元.桁段有限元法分析钢桁梁桥振动[J].深圳大学学报理工版,2011,28(No.3(189-282)):195.
 YANG Shi-ruo and ZENG Qing-yuan.Analysis of steel truss girder bridge vibrations by finite truss element method[J].Journal of Shenzhen University Science and Engineering,2011,28(3):195.
[7]诸葛萍,强士中,任伟平,等.碳纤维主缆鞍座处抗滑移试验[J].深圳大学学报理工版,2011,28(No.5(377-470)):395.
 ZHUGE Ping,QIANG Shi-zhong,REN Wei-ping,et al.Experiment of slip behavior of CFRP cable against saddle[J].Journal of Shenzhen University Science and Engineering,2011,28(3):395.
[8]苏伟,强士中,刘明虎,等.CFRP主缆与索夹间摩擦学性能试验研究侯[J].深圳大学学报理工版,2012,29(No.3(189-282)):201.[doi:10.3724/SP.J.1249.2012.03201]
 HOU Su-wei,QIANG Shi-zhong,LIU Ming-hu,et al.Experimental investigation of tribological properties between CFRP main cable and clamp[J].Journal of Shenzhen University Science and Engineering,2012,29(3):201.[doi:10.3724/SP.J.1249.2012.03201]
[9]朱文正.多跨简支梁桥加固措施的抗震性能评估[J].深圳大学学报理工版,2015,32(No.2(111-220)):152.[doi:10.3724/SP.J.1249.2015.02152]
 Zhu Wenzheng.Seismic performance evaluation of retrofit measures for multi-span simple-supported bridges[J].Journal of Shenzhen University Science and Engineering,2015,32(3):152.[doi:10.3724/SP.J.1249.2015.02152]
[10]彭晶蓉,贺拴海,李尧.基于索梁活载比的部分斜拉桥布索形式比较[J].深圳大学学报理工版,2017,34(No.5(441-550)):482.
 Peng Jingrong,He Shuanhai,and Li Yao.Comparison of cable designs based on the distribution ratio between cable and beam of extra-dosed bridge[J].Journal of Shenzhen University Science and Engineering,2017,34(3):482.
[11]谭毅平,韩大建.预应力混凝土箱梁桥日照温度效应研究[J].深圳大学学报理工版,2008,25(1):43.
 TAN Yi-ping and HAN Da-jian.Study on solar temperature effect of prestressed concrete box-girder bridge[J].Journal of Shenzhen University Science and Engineering,2008,25(3):43.

备注/Memo

备注/Memo:
收稿日期:2010-03-15
基金项目:交通部西部交通建设科技资助项目(200731822340)
作者简介:李宏江(1973-),男(汉族),河北省迁安市人,交通运输部公路科学研究院副研究员、博士.E-mail:hj.li@rioh.cn
更新日期/Last Update: 2010-07-30