[1]张成,吴慧,高博青,等.肋环型索穹顶结构的几何法施工及工程应用[J].深圳大学学报理工版,2012,29(No.3(189-282)):195-200.[doi:10.3724/SP.J.1249.2012.03195]
 ZHANG Cheng,WU Hui,GAO Bo-qing,et al.Geometry-based construction technique and application of Geiger type cable dome[J].Journal of Shenzhen University Science and Engineering,2012,29(No.3(189-282)):195-200.[doi:10.3724/SP.J.1249.2012.03195]
点击复制

肋环型索穹顶结构的几何法施工及工程应用()
分享到:

《深圳大学学报理工版》[ISSN:1000-2618/CN:44-1401/N]

卷:
第29卷
期数:
2012年No.3(189-282)
页码:
195-200
栏目:
土木建筑工程
出版日期:
2012-05-21

文章信息/Info

Title:
Geometry-based construction technique and application of Geiger type cable dome
作者:
张成1吴慧2高博青1王昌洪3
1) 浙江大学建筑工程学院,杭州 310058
2) 浙江财经学院工商管理学院,杭州 310018
3) 晟元集团有限公司,浙江金华 321000
Author(s):
ZHANG Cheng1 WU Hui2 GAO Bo-qing1 and WANG Chang-hong3
1) College of Civil Engineering and Architecture, Zhejiang University, Hangzhou 310058, P.R.China
2) College of Business Administration, Zhejiang University of Finance and Economics, Hangzhou 310018, P.R.China
3) Shengyuan Group Co Ltd, Jinhua 321000, Zhejiang Province, P.R.China
关键词:
结构工程索穹顶结构几何法施工端斜索张拉大跨度建筑
Keywords:
structure engineering cable dome geometry-based construction technique pulling the outmost diagonal cables large span building
分类号:
TU 393.3;TU 765
DOI:
10.3724/SP.J.1249.2012.03195
文献标志码:
A
摘要:
针对索穹顶结构张拉难于控制和安装技术要求高的问题,提出一种只需张拉端部斜索的肋环型索穹顶结构施工成形方法.根据肋环型索穹顶结构竖压杆、脊索和斜索之间的几何关系,计算安装过程的竖压杆临时标高,设计并采用几何法安装了中国第一座索穹顶结构,验证了该施工成形方案的可行性.结果表明,几何施工法只需张拉端部斜索,索穹顶结构会自动成形,不需要大规模调整拉索的预应力,降低了施工技术要求,使索穹顶结构有可能得到普遍推广.
Abstract:
In consideration of the issues that the prestress process of cable dome is difficult to control and technical requirements of installation is high, a geometry-based construction technique for Geiger type cable dome is proposed, in which only the outmost diagonal cables need to be pulled. The principle of geometry-based construction technique is that when the distance between nodes is less than the original length of the cable, tensioning devices are not necessary for the assembly. Based on the geometric relation of the strut, ridge cable and diagonal cable of Geiger type dome, the temporary elevations of struts during installation were calculated, and reference tables for constructions of cable domes with common geometric parameters were given. The first domestic cable dome in China was designed and assembled using geometry-based construction technique, which verified the feasibility of the construction technique. The results show that only the outmost diagonal cables need to be pulled in geometry-based construction technique, and the cable dome can automatically form the design shape. During the installation process, the prestress of the cables dont need large-scale adjustment. The geometry-based construction technique can reduce the technical requirements for construction, and could make this structure form widespread promoted.

参考文献/References:

[1] YUAN Xing-fei, DONG Shi-lin. Application of integrity feasible prestressing to tensegrity cable domes[J]. China Civil Engineering Journal, 2001, 34(2): 33-37.(in Chinese)
袁行飞,董石麟. 索穹顶结构整体可行预应力概念及其应用[J]. 土木工程学报,2001,34(2): 33-37.
[2] DONG Shi-lin, YUAN Xing-fei. A simplified calculation method for initial prestress distribution of sunflower-patterned cable domes [J]. Journal of Building Structures, 2004, 25(6): 9-14. (in Chinese)
董石麟,袁行飞. 葵花型索穹顶初始预应力分布的简捷计算法[J]. 建筑结构学报,2004,25(6): 9-14.
[3] ZHENG Jun-hua, LUO Yao-zhi, DONG Shi-lin, et al. Model experimental research on rectangular cable dome [J]. Journal of Building Structures, 2008, 29(2): 25-31.(in Chinese)
郑君华,罗尧治,董石麟,等. 矩形平面索穹顶结构的模型试验研究[J]. 建筑结构学报,2008,29(2): 25-31.
[4] CHEN Lian-meng, DONG Sh-lin, YUAN Xing-fei. Experimental study of Kiewitt dome model [J]. Journal of Zhejiang University Engineering Science, 2008,42(2): 364-368.(in Chinese)
陈联盟,董石麟,袁行飞. Kiewitt型索穹顶结构模型试验研究[J]. 浙江大学学报工学版,2008,42(2): 364-368.
[5] Wang Z H, Yuan X F, Dong S L. Simple approach for force finding analysis of circular Geiger domes with consideration of self-weight[J]. Journal of Constructional Steel Research, 2010, 66(2): 317-322.
[6] Xi Y, Xi Z, Qin W H. Form-finding of cable domes by simplified force density method[J]. Proceedings of the Institution of Civil Engineers-Structures and Buildings. 2011, 164(3): 181-195.
[7] Yuan X F, Wang Z H, Dong S L. Simplified techniques for prestress design and load analysis of geiger domes[J]. Advanced Science Letters, 2011, 4(8/10): 3256-3260.
[8] Fang H Q, Zhou C T, Yang F. Research on Analysis Method and Distributing Principle of the Optimal Prestress in Sunflower-patterned Cable Dome[M]. Stafa-Zurich(Swiss): Trans Tech Publications Ltd, 2011: 163-167, 740-744.
[9] Chen L M, Dong S L. Dynamical Characteristics Research on Cable Dome[M]. Stafa-Zurich:Trans Tech Publications Ltd, 2011: 163-167, 3882-3886.
[10] HE Jian, YUAN Xing-fei, JIN Bo. Analysis of cable domes with rupture of local cable[J]. Journal of Vibration and Shock, 2010, 29(11): 13-16.(in Chinese)
何键, 袁行飞, 金波. 索穹顶结构局部断索分析[J]. 振动与冲击, 2010, 29(11):13-16.
[11] XU Guo-jie, ZHUO Xin, SHOU Quan-gen. Structural performance of TH-Levy cable dome when local component failure[J]. Journal of Zhejiang University Engineering Science, 2011, 45(7): 1281-1287.(in Chinese)
许国杰, 卓新, 寿全根. TH-Levy型索穹顶局部构件失效时的受力性能[J]. 浙江大学学报工学版, 2011, 45(7): 1281-1287.
[12] Yuan X F, Chen L M, Dong S L. Prestress design of cable domes with new forms[J]. International Journal of Solids and Structures,2007, 44(9): 2773-2782.
[13] YUAN Xing-fei, DONG Shi-lin. New forms and initial prestress calculation of cable domes[J].Engineering Mechanics, 2005, 22(2): 22-26.(in Chinese)
袁行飞,董石麟. 索穹顶结构的新形式及其初始预应力确定[J]. 工程力学, 2005, 22(2): 22-26.
[14] Geiger D H, Stenfaniuk A, Chen D. The design and construction of two cable domes for the Korean Olympics [C]// Proceedings of the IASS-ASCE International Symposium on Shells,Membranes and Space Frames. Osaka(Japan): Elsevier, 1986: 265-272.
[15] Levy M P. Georgia dome and beyond: achieving lightweight-longspan structures[C]// Proceedings of the IASS-ASCE International Symposium 1994 on Spatial, Lattice and Tension Structures. Atlanta(America): ASCE, 1994: 560-562.
[16] Terry, Wesley R. Georgia dome cable roof construction techniques[C]// Proceedings of the IASS-ASCE International Symposium 1994 on Spatial Lattice and Tension Structures. Atlanta(America): ASCE, 1994: 563-572.
[17] SHEN Zu-yan, ZHANG Lin-xin. Simulation of erection procedures of cable domes based on nonlinear FEM[J]. Computational Mechanics, 2002, 19(4): 414-419.(in Chinese)
沈祖炎,张立新. 基于非线性有限元的索穹顶施工模拟分析 [J]. 计算力学学报,2002,19(4): 414-419.
[18] CHEN Lian-meng, DONG Shi-lin, YUAN Xing-fei. Theoretical and experimental study on the construction of cable domes[J]. China Civil Engineering Journal, 2006, 39(11): 33-36, 113.(in Chinese)
陈联盟,董石麟,袁行飞. 索穹顶结构施工成形理论分析和试验研究[J]. 土木工程学报,2006,39(11): 33-36, 113.
[19] ZHENG Jun-hua, DONG Shi-lin, ZHAN Wei-dong. Experimental research on construction process of Levy type cable domes[J]. Journal of Building Structures, 2006, 27(1): 112-116.(in Chinese)
郑君华,董石麟,詹伟东. 葵花型索穹顶结构的多种施工张拉方法及其试验研究[J]. 建筑结构学报,2006,27(1): 112-116.
[20] CHEN Lian-meng, DONG Shi-lin, YUAN Xing-fei. Theoretical analysis of construction procedures of cable-domes[J]. Engineering Mechanics, 2008, 25(4): 134-139.(in Chinese)
陈联盟,董石麟,袁行飞. 索穹顶结构施工成形理论分析[J]. 工程力学,2008,25(4): 134-139.
[21] YUAN Xing-fei, DONG Shi-lin. Inverse analysis of construction process of cable dome[J]. Journal of Building Structures, 2001, 22(2): 75-79, 96.(in Chinese)
袁行飞, 董石麟. 索穹顶结构施工控制反分析[J]. 建筑结构学报, 2001, 22(2): 75-79, 96.
[22] CHENG Rui, HE Jing-yun, HUANG Zong-ming, et al. Study on tension and block shear behavior of bolted single angle-gusset plates[J]. Journal of Shenzhen University Science and Engineering, 2009, 26(4): 382-388.(in Chinese)
程睿, 何井运, 黄宗明, 等. 单角钢螺栓连接节点板拉剪性能研究[J]. 深圳大学学报理工版, 2009, 26(4): 382-388.

相似文献/References:

[1]朱美春,刘建新,王清湘.钢骨-方钢管高强混凝土柱的轴压比限值[J].深圳大学学报理工版,2010,27(1):95.
 ZHU Mei-chun,LIU Jian-xin,and WANG Qing-xiang.Axial load limit for square steel tubes filled with steel-reinforced high-strength concrete[J].Journal of Shenzhen University Science and Engineering,2010,27(No.3(189-282)):95.
[2]周海俊,米红雨,谭也平.锈蚀-疲劳作用下的砼梁桥失效概率分析[J].深圳大学学报理工版,2010,27(1):109.
 ZHOU Hai-jun,MI Hong-yu,and TAN Ye-ping.Failure probability analysis of reinforced concrete bridges under coupled corrosion fatigue effects[J].Journal of Shenzhen University Science and Engineering,2010,27(No.3(189-282)):109.
[3]白音,石永久,王元清.火灾中网架结构受力分析与设计方法[J].深圳大学学报理工版,2011,28(No.2(095-188)):113.
 BAI Yin,SHI Yong-jiu,and WANG Yuan-qing.Mechanical properties analysis and design method for grid structures under fire conditions[J].Journal of Shenzhen University Science and Engineering,2011,28(No.3(189-282)):113.
[4]管民生,韩大建,杜宏彪,等.钢筋混凝土框架结构的抗震性能指标研究[J].深圳大学学报理工版,2011,28(No.3(189-282)):200.
 GUAN Min-sheng,HAN Da-jian,DU Hong-biao,et al.A new seismic performance index for reinforced concrete frame structures[J].Journal of Shenzhen University Science and Engineering,2011,28(No.3(189-282)):200.
[5]蔡健,林焕彬,侯磊,等.带约束拉杆矩形钢管混凝土短柱延性分析[J].深圳大学学报理工版,2011,28(No.3(189-282)):213.
 CAI Jian,LIN Huan-bin,HOU Lei,et al.Analysis of ductility of rectangular concrete-filled steel tube stub columns with binding bars subjected to eccentric loading[J].Journal of Shenzhen University Science and Engineering,2011,28(No.3(189-282)):213.
[6]方明霁,李国强,李一松.型钢混凝土中高剪力墙的抗震性能[J].深圳大学学报理工版,2012,29(No.1(001-094)):38.[doi:10.3724/SP.J.1249.2012.01038]
 FANG Ming-ji,LI Guo-qiang,and LI Yi-song.Seismic behavior of steel reinforced concrete mid-rise shear wall[J].Journal of Shenzhen University Science and Engineering,2012,29(No.3(189-282)):38.[doi:10.3724/SP.J.1249.2012.01038]
[7]蔡健,梁伟盛,林辉.方钢管混凝土柱抗剪性能试验研究[J].深圳大学学报理工版,2012,29(No.3(189-282)):189.[doi:10.3724/SP.J.1249.2012.03189]
 CAI Jian,LIANG Wei-sheng,et al.Experimental study on shear resistance performance of concrete filled square steel tubular columns[J].Journal of Shenzhen University Science and Engineering,2012,29(No.3(189-282)):189.[doi:10.3724/SP.J.1249.2012.03189]
[8]陆金钰,李娜,范圣刚.面向几何坐标的张拉整体结构找形算法[J].深圳大学学报理工版,2012,29(No.3(189-282)):211.[doi:10.3724/SP.J.1249.2012.03211]
 LU Jin-yu,LI Na,and FAN Sheng-gang.Geometry-oriented form-finding method for tensegrity[J].Journal of Shenzhen University Science and Engineering,2012,29(No.3(189-282)):211.[doi:10.3724/SP.J.1249.2012.03211]
[9]傅学怡,徐娜.新型矩形钢管混凝土柱节点轴压传力机制研究[J].深圳大学学报理工版,2012,29(No.4(283-376)):283.[doi:10.3724/SP.J.1249.2012.04283]
 FU Xue-yi and XU Na.Research on axial compression force transmission mechanism of a new form of concrete-filled rectangular steel tube column joint[J].Journal of Shenzhen University Science and Engineering,2012,29(No.3(189-282)):283.[doi:10.3724/SP.J.1249.2012.04283]
[10]姚永红,武振宇.畸变缺陷对冷弯薄壁型钢柱力学性能的影响[J].深圳大学学报理工版,2012,29(No.5(377-470)):421.[doi:10.3724/SP.J.1249.2012.05421]
 YAO Yong-hong and WU Zhen-yu.Effects of distortional imperfections on mechanical properties of cold-formed thin-walled steel columns[J].Journal of Shenzhen University Science and Engineering,2012,29(No.3(189-282)):421.[doi:10.3724/SP.J.1249.2012.05421]

备注/Memo

备注/Memo:
Received:2010-09-27;Revised:2011-12-07;Accepted:2012-03-02
Foundation:National Natural Science Foundation of China(51178414) ; Natural Science Foundation of Zhejiang Province(Y1110438)
Corresponding author:Professor GAO Bo-qing. E-mail: bqgao@zju.edu.cn
Citation:ZHANG Cheng, WU Hui, GAO Bo-qing,et al.Geometry-based construction technique and application of Geiger type cable dome[J]. Journal of Shenzhen University Science and Engineering, 2012, 29(3): 195-200.(in Chinese)
基金项目:国家自然科学基金资助项目(51178414);浙江省自然科学基金资助项目(Y1110438)
作者简介:张成(1986-),男(汉族),河南省郑州市人,浙江大学博士研究生.E-mail: c-zhang@zju.edu.cn
引文:张成,吴慧,高博青,等. 肋环型索穹顶结构的几何法施工及工程应用[J]. 深圳大学学报理工版,2012,29(3):195-200.
更新日期/Last Update: 2012-05-28